Concrete Footing Calculator

Last reviewed: November 16, 2026. Formulas checked against standard industry conversions. How we calculate.

Last reviewed: November 16, 2026. Formulas checked against standard industry conversions. How we calculate.

Quick answer: A 40-foot footing, 12 inches wide and 8 inches deep, needs 26.67 cu ft (0.99 cu yd) of concrete — 45 exact 80-lb bags, or 49 bags with 10% waste — plus 80 ft of rebar, which is 4 x 20-ft bars.

Use this free concrete footing calculator to work out how much concrete you need for a strip footing. Enter the footing length, width and depth, and it gives you the concrete volume in cubic feet and cubic yards, the exact and buy bag counts for 60-lb and 80-lb bags, the rebar length and number of 20-ft bars, and the estimated material cost.















A concrete footing spreads the weight of a wall, deck or structure over a wider area of soil, so the building does not settle or crack. The volume is simply length times width times depth, but the width and depth are in inches while the length is in feet, so the calculator converts everything to cubic feet first and then to cubic yards for ordering.

How a concrete footing is calculated

  1. Concrete volume (cu ft): footing length (ft) x width (in) x depth (in) / 144.
  2. Cubic yards: cubic feet / 27.
  3. Volume to buy: cubic feet x (1 + waste / 100). The default waste allowance is 10%.
  4. 80-lb bags: volume / 0.60 cu ft per bag, rounded up. Use the exact volume for exact bags and the buy volume for bags to buy.
  5. 60-lb bags: volume / 0.45 cu ft per bag, rounded up.
  6. Rebar length: rebar runs x footing length. Two runs is standard for a narrow footing; use three runs for wider or heavily loaded footings.
  7. 20-ft bars: rebar length / 20, rounded up.
  8. Estimated cost: buy volume in cubic yards x price per cubic yard.

Worked examples

Example 1 — a 40 ft footing, 12 in wide, 8 in deep. Volume = 40 x 12 x 8 / 144 = 26.67 cu ft = 0.99 cu yd. With 10% waste = 29.33 cu ft = 1.09 cu yd. 80-lb bags: 26.67 / 0.60 = 45 exact, 29.33 / 0.60 = 49 to buy. 60-lb bags: 26.67 / 0.45 = 60 exact, 29.33 / 0.45 = 66 to buy. Rebar: 2 runs x 40 ft = 80 ft = 4 x 20-ft bars. Cost: 29.33 / 27 x $150 = $162.94.

Example 2 — a 30 ft footing, 16 in wide, 12 in deep. Volume = 30 x 16 x 12 / 144 = 40.00 cu ft = 1.48 cu yd. With 10% waste = 44.00 cu ft = 1.63 cu yd. 80-lb bags: 40.00 / 0.60 = 67 exact, 44.00 / 0.60 = 74 to buy. 60-lb bags: 40.00 / 0.45 = 89 exact, 44.00 / 0.45 = 98 to buy. Rebar: 2 runs x 30 ft = 60 ft = 3 x 20-ft bars. Cost: 44.00 / 27 x $150 = $244.44.

Footing volume and cost table

For a 40-ft footing, 8 in deep, with 10% waste, at $150 per cu yd.

Footing widthConcrete volumeCubic yardsVolume to buy80-lb bags to buy60-lb bags to buyEstimated cost
8 in17.78 cu ft0.66 cu yd19.56 cu ft3344$108.67
12 in26.67 cu ft0.99 cu yd29.33 cu ft4966$162.94
16 in35.56 cu ft1.32 cu yd39.11 cu ft6687$217.28
24 in53.33 cu ft1.98 cu yd58.67 cu ft98131$325.94

Strip footings vs deck footings vs Sonotube

Strip footings are continuous trenches of concrete under a wall, such as a foundation wall or a garden wall. They spread the load along the full length of the wall, and this calculator is made for them: enter the total run length, the trench width and the pour depth.

Deck footings are separate pads or piers under each deck post, rather than one continuous run. If you are building a deck, work out each post footing separately with the Deck Footing Calculator, and use the Post Hole Concrete Calculator for the concrete in each post hole.

Sonotube footings use round cardboard forms to pour a cylindrical pier, which is common for decks, fences and light structures on sloped or frost-prone ground. A round pier uses less concrete than a square footing of the same width, so use the Sonotube Calculator for those. For a general slab or pad pour, use the Concrete Calculator.

Frequently asked questions

How much concrete do I need for a footing?

Multiply length (ft) x width (in) x depth (in) and divide by 144 to get cubic feet, then divide by 27 for cubic yards. A 40 ft footing, 12 in wide and 8 in deep, needs 26.67 cu ft (0.99 cu yd) before waste, or 29.33 cu ft (1.09 cu yd) with 10% waste.

How many bags of concrete do I need for a footing?

Divide the volume by the bag yield and round up: an 80-lb bag yields 0.60 cu ft and a 60-lb bag yields 0.45 cu ft. For the 40 ft footing above, buy 49 x 80-lb bags or 66 x 60-lb bags with 10% waste.

How much rebar do I need in a footing?

Use two continuous runs of rebar for most footings, or three runs for wider footings and heavier loads. Rebar length is runs x footing length, and bars are sold in 20-ft lengths, so a 40 ft footing with two runs needs 80 ft of rebar, which is 4 x 20-ft bars.

How wide and deep should a footing be?

A common residential footing is 12 in wide and 8 in deep, but the right size depends on the wall load, the soil and local building code. Footings must usually sit below the frost line, so check your local code before you dig.

How much does a concrete footing cost?

At $150 per cubic yard, a 40 ft footing, 12 in wide and 8 in deep, costs about $162.94 in concrete with 10% waste. Ready-mix prices vary by region, and bagged concrete usually costs more per cubic yard than ready-mix for larger pours.

Do I need to add waste when ordering concrete?

Yes. Allow about 10% extra for spillage, uneven trench bottoms and over-excavation. Order a little more than the exact volume — running short mid-pour is far worse than having a bag or two left over.

Related calculators: Deck Footing Calculator · Post Hole Concrete Calculator · Sonotube Calculator · Concrete Calculator

Ready to calculate?

Start with your measurements and get a material estimate in seconds.

Explore all calculators