Last reviewed: October 24, 2026. Formulas checked against standard industry conversions. How we calculate.
How much extra material should I buy? Exact quantities rarely survive real jobsites. Cuts, breakage, settling and uneven ground all use more material than the math says.
Typical allowances
| Material | Extra |
|---|---|
| Gravel and mulch | 5 to 10% |
| Pavers (simple layout) | 5 to 7% |
| Pavers (diagonal, curves) | 10 to 15% |
| Deck boards | 10% (15% diagonal) |
| Fence posts and panels | 0 to 5%, plus a spare |
Why it matters
- A second delivery or trip often costs more than the extra material.
- Pavers and boards vary between batches, so a late top-up may not match.
- Keep leftovers for future repairs.
Treat these as starting points. Complex layouts and inexperienced installers should lean toward the higher end.
Browse Calculators → | Related: How to Measure Your Project Area