Last reviewed: November 14, 2026. Formulas checked against standard industry conversions. How we calculate.
Quick answer: A 20-by-10-foot slope with 6-inch riprap needs about 12.2 tons of stone — 11.11 tons exact, plus 10% waste — costing about $733 at $60 a ton. Use the calculator below for your slope size and stone size.
Use this free riprap calculator (also a riprap stone calculator for erosion control) to estimate how many tons, cubic yards and truckloads of riprap you need. Enter your slope size, choose a stone size, and get an instant estimate in tons, cubic yards and cost.
Whether you are protecting a shoreline, lining a drainage swale, or stabilizing a steep bank, an accurate estimate helps you plan delivery and avoid ordering too much or too little.
Riprap Calculator
Enter the size of the slope you want to protect. Choose the stone size and the calculator sets the layer thickness for you.
Riprap weighs about 1.5 tons per cubic yard. Unless you add a waste allowance, the calculator shows the exact geometric volume of the stone layer.
How riprap is sized
Riprap is sized by the stone, and the layer is about twice the stone size. A thicker layer of larger stone resists faster water and steeper slopes. Pick the stone for the water and slope you have, and the calculator sets the layer thickness.
| Stone size | Layer thickness | Best for |
|---|---|---|
| 6 in | 12 in | Light slopes, swales |
| 9 in | 18 in | Moderate slopes |
| 12 in | 24 in | Steep banks, shoreline |
| 18 in | 36 in | Heavy erosion, fast water |
The rule is simple: layer thickness is about twice the stone size. A 6-inch stone goes down in a 12-inch layer, and a 12-inch stone needs a 24-inch layer.
Coverage per ton
How much area one ton of riprap covers depends on the layer thickness. Thicker layers cover less ground per ton.
| Layer thickness | Area covered by 1 ton |
|---|---|
| 12 in | About 18 sq ft |
| 18 in | About 12 sq ft |
| 24 in | About 9 sq ft |
| 36 in | About 6 sq ft |
One ton of riprap is about two-thirds of a cubic yard (18 cubic feet). Divide 18 cubic feet by the layer in feet to get the coverage: 18 ÷ 1 = 18 sq ft at a 12-inch layer, and 18 ÷ 2 = 9 sq ft at a 24-inch layer.
How much riprap by slope size
Worked examples at the calculator defaults — $60 per ton and 10% waste.
| Slope size | Stone | Area | Cu yd | Tons | Tons to order | Material cost |
|---|---|---|---|---|---|---|
| 10 × 10 ft | 6 in | 100 sq ft | 3.70 | 5.56 | 6.11 | $366.67 |
| 20 × 10 ft | 6 in | 200 sq ft | 7.41 | 11.11 | 12.22 | $733.33 |
| 20 × 20 ft | 9 in | 400 sq ft | 22.22 | 33.33 | 36.67 | $2,200.00 |
| 50 × 20 ft | 12 in | 1,000 sq ft | 74.07 | 111.11 | 122.22 | $7,333.33 |
Where riprap is used
Riprap is used where moving water meets soil: shorelines, drainage swales, culvert outlets and steep banks. The angular stones lock together and break up the flow, so the soil underneath stays put. It is erosion control, not decoration — for a decorative stone bed, river rock is the better choice.
Riprap vs river rock
Riprap is angular, interlocking stone sized for water flow: the rough edges grip each other and hold the layer together on a slope. River rock is rounded and decorative — it looks good in a garden bed, but it rolls and shifts under water, so it is a poor choice for erosion control. If you are covering a bed or a dry creek, use the River Rock Calculator instead.
Frequently asked questions
How many tons of riprap do I need?
Multiply the slope length by the width to get square feet, multiply by the layer in feet to get cubic feet, divide by 27 for cubic yards, then multiply by 1.5 tons per cubic yard. A 20-by-10-foot slope with 6-inch stone (a 12-inch layer) needs 11.11 tons — order 12.22 tons with 10% waste.
How thick should riprap be?
About twice the stone size. A 6-inch stone goes down in a 12-inch layer, a 9-inch stone in an 18-inch layer, a 12-inch stone in a 24-inch layer, and an 18-inch stone in a 36-inch layer.
How much does riprap cost per ton?
Delivered riprap typically costs $40–$80 per ton, depending on stone size, quarry distance and delivery. The calculator uses $60 per ton as the default.
How much area does a ton of riprap cover?
About 18 square feet at a 12-inch layer, and about 9 square feet at a 24-inch layer. Thicker layers cover less ground per ton because the same ton is spread deeper.
What size riprap do I need?
Use 6-inch stone for light slopes and swales, 9-inch stone for moderate slopes, 12-inch stone for steep banks and shoreline, and 18-inch stone for heavy erosion and fast water.
Do I need fabric under riprap?
Yes. Lay geotextile fabric under the stone first. It keeps soil from washing through the gaps between stones while still letting water drain, so the slope stays stable.
Related calculators: Rock Calculator · River Rock Calculator · French Drain Calculator.