Quick answer: A 20 × 10 ft dig 3 ft deep is 600 cu ft of soil — 22.22 cu yd. With a 10% swell allowance that is 24.44 cu yd to haul, 3 truckloads at 10 cu yd per truck, and about 30.00 tons of topsoil.
Use this free excavation calculator to work out how much earth you need to dig out of a hole, trench, foundation or pond. Enter the length, width and depth of the dig, pick the soil type and add a swell allowance, and it gives you the volume in cubic feet and cubic yards, the volume to haul once the soil loosens, the number of truckloads, and the spoil weight in tons.
Excavation volume is the volume of the hole you dig. Measure the length, width and depth in feet, multiply them for cubic feet, then divide by 27 for cubic yards. Because loosened soil takes up more space than compacted soil in the ground, add a swell allowance — usually about 10% — to work out how much you actually have to haul away.
How excavation volume is calculated
- Measure the dig: length, width and depth in feet. For a trench, the length is the run of the trench.
- Cubic feet: length × width × depth.
- Cubic yards: cubic feet ÷ 27, because one cubic yard is 27 cubic feet.
- Cubic yards to haul: cubic yards × (1 + swell % ÷ 100). A 10% swell allowance turns 22.22 cu yd into 24.44 cu yd to haul.
- Truckloads: cubic yards to haul ÷ 10, rounded up. A standard dump truck carries about 10 cubic yards.
- Spoil weight: cubic yards × soil density in tons per cubic yard. Use the table below for typical densities.
Worked examples
Example 1 — a garden dig. A dig 20 ft long, 10 ft wide and 3 ft deep, in topsoil, with a 10% swell allowance. Cubic feet = 20 × 10 × 3 = 600 cu ft. Cubic yards = 600 ÷ 27 = 22.22 cu yd. Cubic yards to haul = 22.22 × 1.10 = 24.44 cu yd. Truckloads = 24.44 ÷ 10 = 2.44, rounded up to 3 truckloads. Spoil weight = 22.22 × 1.35 = 30.00 tons.
Example 2 — a large foundation dig. A dig 30 ft long, 20 ft wide and 4 ft deep, in clay, with a 10% swell allowance. Cubic feet = 30 × 20 × 4 = 2,400 cu ft. Cubic yards = 2,400 ÷ 27 = 88.89 cu yd. Cubic yards to haul = 88.89 × 1.10 = 97.78 cu yd. Truckloads = 97.78 ÷ 10 = 9.78, rounded up to 10 truckloads. Spoil weight = 88.89 × 1.50 = 133.33 tons.
Soil density reference table
Typical loose densities for excavated soil. Use these to convert cubic yards to tons.
| Soil type | Density (t/yd³) |
|---|---|
| Topsoil | 1.35 |
| Clay | 1.50 |
| Sand | 1.40 |
| Gravel mix | 1.50 |
Frequently asked questions
How many cubic yards of dirt is a 10×10×3 ft dig?
A 10 × 10 × 3 ft dig is 300 cu ft, which is 300 ÷ 27 = 11.11 cu yd. With a 10% swell allowance that is 12.22 cu yd to haul — 2 truckloads at 10 cu yd per truck — and about 15.00 tons if the soil is topsoil.
How much does excavated soil weigh per cubic yard?
It depends on the soil type: topsoil weighs about 1.35 tons per cubic yard, sand about 1.40 tons, and clay or gravel mix about 1.50 tons per cubic yard. Multiply your exact cubic yards by the density to get the spoil weight in tons.
How many truckloads is my excavation?
Divide the cubic yards to haul — the exact volume plus your swell allowance — by the truck capacity, usually 10 cubic yards, and round up. For example, 24.44 cu yd to haul needs 3 truckloads.
What is swell factor?
Swell factor is the extra volume soil takes up once it is loosened by digging. Soil in the ground is compacted; once dug out it bulks up, typically by about 10%. That is why the volume to haul is larger than the volume of the hole.
How deep can I dig without shoring?
Check your local rules before you dig, and always call 811 to mark buried utilities. As general guidance, trenches over 4–5 ft deep typically need shoring or sloping to keep the sides from collapsing, and deeper excavations usually need a professional and a permit.
Do I need a permit to excavate?
It depends on where you live, how deep you are digging and how close you are to property lines, foundations and utilities. Small garden digs usually need no permit, but foundation work, deep trenches and digging near public land often do. Check with your local building department before you start.
Related calculators: Backfill Calculator, Dirt Calculator, Pond Volume Calculator.